Reorder point and safety stock calculator
Find the stock level at which to place your next order and how much safety stock covers the risk, with two methods and every step written out.
The working
How to calculate the reorder point
The reorder point is the stock level that should trigger a new order. It covers the demand you expect while the order is on its way, plus a safety stock for the days when demand or delivery is worse than average.
- Choose a method Use the maximum and average method when you know your best and worst case. Use the service level method when you can estimate how much demand varies.
- Enter average daily demand Use units sold or used per day over a representative period. Exclude one-off spikes you do not expect to repeat.
- Enter the lead time Count the days from placing the order to having the goods on the shelf and ready to sell.
- Add the worst case or the variation For the first method enter the highest daily demand and the longest lead time. For the second enter the standard deviation of daily demand, the variation of the lead time and the service level you want.
- Read the reorder point The tool shows the demand during the lead time, the safety stock and the reorder point, rounded up to whole units.
- Check your stock Enter what you have on hand and on order to see whether it is time to order now.
Tips for better reorder points
- Measure lead time from the order date to the date the goods are usable, not to the date of dispatch.
- Recalculate when demand or supplier performance changes, and after each season.
- Use a higher service level only for items where a stock-out is costly, because safety stock ties up money.
- Count stock already ordered together with stock on hand when you decide whether to order.
- Review safety stock for slow items separately, because averages hide long gaps between sales.
Common reorder point mistakes
- Ignoring lead time variation If deliveries are sometimes late, a reorder point based only on demand variation will not protect you.
- Using monthly figures as daily ones Demand and lead time must use the same unit. Divide monthly demand into days before you calculate.
- Counting only stock on hand Stock that is already on order still arrives. Ignoring it triggers duplicate orders.
- Setting the service level to 100 percent A 100 percent service level needs unlimited safety stock under a normal model, which is why the tool accepts levels below 100.
Open it pre-filled with a link
Every field accepts a query parameter with the same name, so a link, a script or an AI agent can fill the tool in and run it. Open an example: /tools/reorder-point-calculator/?method=service&avg=20<=5&sd=4&level=95
| Parameter | Values | What it does |
|---|---|---|
method | maxavg · service (default: maxavg) | maxavg for the maximum and average method, service for the service level method. |
avg | number | Average daily demand in units. |
max | number | Maximum daily demand in units (maxavg method). |
lt | number | Average lead time in days. |
ltmax | number | Maximum lead time in days (maxavg method). |
sd | number | Standard deviation of daily demand (service method). |
ltsd | number (default: 0) | Standard deviation of the lead time in days (service method, optional). |
level | number (default: 95) | Service level in percent, between 50 and 100, for example 95. |
onhand | number | Stock on hand, for the order check. |
onorder | number (default: 0) | Stock already on order, for the order check. |
What this reorder point calculator includes
It performs the standard textbook calculations from the figures you enter. It does not forecast demand or know your supplier.
- Maximum and average method Safety stock is the highest daily demand times the longest lead time, minus the average demand times the average lead time.
- Service level method Safety stock is the z-score of the service level times the standard deviation of demand over the lead time, with optional lead time variation.
- Z-score from the service level Pick a service level such as 95 or 99 percent, or type any value, and the tool computes the matching z-score.
- Every step shown The working is written out with your numbers, so a colleague can verify it and you can explain it.
- Stock check Enter stock on hand and on order to see whether the position is at or below the reorder point.
- Whole units Results are rounded up to whole units, so you never plan below the calculated level.
- Link to a calculation Every field has a query parameter, so you can share a setup or let a script fill it in.
- Private by design All figures are calculated in your browser and are never uploaded.
Common service levels and their z-scores
| Service level | Z-score | Meaning |
|---|---|---|
| 90 percent | 1.28 | About 1 cycle in 10 ends in a stock-out |
| 95 percent | 1.64 | About 1 cycle in 20 ends in a stock-out |
| 97.5 percent | 1.96 | About 1 cycle in 40 ends in a stock-out |
| 99 percent | 2.33 | About 1 cycle in 100 ends in a stock-out |
| 99.9 percent | 3.09 | About 1 cycle in 1,000 ends in a stock-out |
Who uses a reorder point calculator
Anyone who holds stock and buys on a lead time can use a reorder point to decide when to order, instead of ordering by feel.
Retailers and online shops
Avoid running out of your best sellers while not over-buying the slow ones.
Wholesalers and distributors
Set reorder points for many items and review them after every change of supplier.
Manufacturers
Keep enough raw materials and components to cover the lead time of the supplier.
Restaurants and cafés
Order perishable and staple ingredients at a consistent level.
Workshops and maintenance teams
Hold critical spares at a level that matches how long a delivery takes.
Students of operations
See how the formulas work with real numbers, step by step.
The result is an estimate based on the figures you enter. Test it against your real order history, and treat very slow or very erratic items with extra care.
How this connects to running the business
A reorder point is only useful when it is checked against live stock and fed into a real order. When stock, purchasing and supplier lead times live in separate files, the numbers go stale. We build Dika Ops so that stock levels, reorder rules and purchase orders work from the same data and a shortage can turn into an order. See more at dikaops.com
Frequently asked questions
What is the reorder point?
It is the stock level at which you place a new order. It equals the demand you expect during the lead time plus safety stock. When stock on hand and on order falls to that level, order.
What is safety stock?
Safety stock is the extra inventory that protects you when demand is higher than average or a delivery is late. It is the part of the reorder point that is not expected demand.
How does the maximum and average method work?
Safety stock is the maximum daily demand times the maximum lead time, minus the average daily demand times the average lead time. It protects against the worst case you have observed, so it is simple but can be generous.
How does the service level method work?
Safety stock equals the z-score of your service level times the standard deviation of demand during the lead time. That deviation combines the variation of daily demand and, if you enter it, the variation of the lead time.
What is a z-score?
It is the number of standard deviations above the average that covers a chosen share of cases under a normal distribution. A 95 percent service level has a z-score of about 1.64.
What does service level mean here?
It is the probability of not running out of stock during one replenishment cycle. It is not the same as a fill rate, which measures the share of units delivered.
Where do I get the standard deviation of demand?
Use a spreadsheet function on your daily sales over a representative period. The result is in the same unit as demand, for example units per day.
Can I link to a calculation?
Yes. Every control accepts a query parameter, so a link can open the tool with your numbers filled in. The list is in the first tab.